Drawing / DFM Quote / RFQ Tooling / Die Casting / Pour CNC Machining Finishing Inspection / Caliper NDT / X-ray Shipping Customs / Import Lead Time One U.S. Contact Quality Assured ISO 9001 Certified Certificate of Conformance Audit Ready Hardness / NDT Quality Cost / Landed Fit U.S. Managed Die Casting Sand Casting CNC Machining Sheet Metal Metal Injection Molding Investment Casting Automotive Medical Defense Heavy Machinery Industrial Equipment Oil & Gas Construction Agriculture Energy Aerospace Alloy / Metal
Precision-cast and machined metal components produced through Redstone in Shenzhen, China

Overseas Production in China.

Casting and machining in Shenzhen

Sand casting, investment casting, die casting, sheet metal fabrication, CNC machining, metal injection molding, and plastic injection molding from a certified facility in Shenzhen. ISO 9001 and IATF 16949 certified, with a U.S. Account Manager owning quality, communication, and customs end to end.

The Shenzhen position

Why engineering teams produce in Shenzhen.

Certified quality first. The widest process and alloy range of any region Redstone operates in, second. Cost-effective landed cost third. Production runs at a certified facility in Shenzhen, with a U.S. Account Manager owning quality, scheduling, and customs end to end.

Engineering reviews every part before quoting.

Production at a certified Shenzhen facility

ISO 9001 · IATF 16949

SPC and third-party inspection on every program

7 processes

Sand casting, investment casting, die casting, CNC, sheet metal, MIM, plastic injection

U.S. customs

Duties assessed and priced into the quote

1 U.S. contact

Bridges the time-zone gap, answers in your hours

Production equipment at a certified Shenzhen facility

Why Redstone

Why buyers run China programs through Redstone.

Certified production, competitive landed cost, and U.S.-based engineering oversight, managed end to end by Redstone's U.S. team.

  1. 01

    Certified production, in-house inspection

    ISO 9001:2015 and IATF 16949 active at the Shenzhen facility. Statistical process control from first article, and third-party inspection at origin before every shipment, with audit-ready documentation included.

  2. 02

    Cost-effective production, landed cost locked at quote

    China remains one of the most cost-effective manufacturing regions for volume programs. Duties and freight are quoted up front so the landed cost you compare is the cost you pay. Cost-effective even on programs where applicable U.S. import duties apply.

  3. 03

    One U.S. Account Manager, accountable end to end

    Your RFQ goes to a vetted certified facility and a dedicated U.S. Account Manager, not a bidding portal. Redstone manages the Shenzhen facility and owns the quality outcome, with one point of contact from quote through receiving dock.

Certified production, controlled from quote to shipment

Shenzhen programs run through certified facilities with inspection, documentation, and U.S.-based engineering oversight.

Capabilities

Shenzhen capabilities

Die Casting, CNC Machining, Sheet Metal Fabrication, Investment Casting managed from Shenzhen with U.S.-based engineering support and documented quality control.

Core processes

4 processes

Die Casting, CNC Machining, Sheet Metal Fabrication, Investment Casting

Lead time

4 to 8 weeks

Confirmed by process during feasibility review

Program value

$50k+

Volume programs with DDP pricing available

Materials

Aluminum, zinc, steel, stainless

And approved production materials

Need help choosing the right Shenzhen process?

Share your part requirements and Redstone will review manufacturability, landed cost, lead time, and quality requirements before quoting.

Why Shenzhen

A lower-cost production path,
without losing control

Shenzhen gives U.S. buyers qualified manufacturing capacity, competitive landed cost, and faster logistics while Redstone's U.S.-based team manages engineering, documentation, and quality communication.

Engineers reviewing a production part at the Shenzhen workshop

Typical offshore sourcing

  • Long freight timelines
  • Time zone delays
  • Unclear landed cost
  • Harder supplier communication
  • Quality issues found late

Redstone in Shenzhen

  • DDP pricing and landed-cost planning
  • U.S.-based engineering support
  • Documented quality before shipment
  • One U.S. point of contact, quote through dock
  • Vetted certified facilities, no bidding portal

Engineering reviews manufacturability, landed cost, lead time, and quality requirements before quoting.

Logistics

U.S. customs and duties, handled end to end.

Redstone is the importer of record and handles U.S. customs brokerage on every China shipment, preparing HTS classification and commercial invoices at the Shenzhen port of export. Applicable duties are assessed at feasibility review and priced into your quote, so the landed cost you approve is the landed cost you pay.

Importer of record
Redstone
Pricing
DDP at quote
Duties & freight
Quoted up front
Landed cost
Matches quote
From quote to production

A five-step process, documented at every handoff

From initial drawings to final delivery, Redstone keeps each stage clear, documented, and aligned with production requirements.

Each handoff is documented. No stage moves forward until drawings, materials, and production requirements are confirmed with the customer.

  1. 01

    Quoting

    Send part files, material spec, and annual volume. Your U.S. Account Manager reviews every submission for manufacturability and process fit before quoting, including alloy selection.

  2. 02

    Order placement

    Review the all-in landed cost, then sign the production agreement. A detailed quotation covers tooling, unit pricing by volume tier, lead time, ocean freight, and applicable duties quoted up front. Redstone confirms the Shenzhen facility assignment, tooling timeline, and first-article schedule.

  3. 03

    Tooling and first article

    Tooling is designed and produced at the Shenzhen certified facility. First-article samples ship to your engineering team for sign-off, with a PPAP package available on regulated programs.

  4. 04

    Production under SPC

    Volume production runs at the Shenzhen certified facility under documented quality control. Statistical process control is applied from first article, with lot traceability maintained end to end. Third-party inspection runs at origin before every shipment.

  5. 05

    Customs, freight, and shipment

    U.S. customs brokerage and applicable duties are handled by the Redstone logistics team and priced into your quote. Ocean freight from the Shenzhen port to your U.S. port of entry, then inland to your dock. Every shipment includes a Certificate of Conformance and a dimensional inspection report. Landed cost matches the quote.

Production proof

The work behind every program.

Casting, machining, fabrication, and inspection running at the Shenzhen facility every week.

High-pressure die-cast aluminum, production-readyCNC machining to print tolerancesMachining centers running recurring programsFinished precision components, ready to shipSecondary machining under documented QCRecurring automotive and hardware programs
01 / 06

Production

High-pressure die-cast aluminum, production-ready

Production work at the Shenzhen facility, run under documented quality control with U.S. engineering oversight.

Production

CNC machining to print tolerances

Production work at the Shenzhen facility, run under documented quality control with U.S. engineering oversight.

Production

Machining centers running recurring programs

Production work at the Shenzhen facility, run under documented quality control with U.S. engineering oversight.

Production

Finished precision components, ready to ship

Production work at the Shenzhen facility, run under documented quality control with U.S. engineering oversight.

Production

Secondary machining under documented QC

Production work at the Shenzhen facility, run under documented quality control with U.S. engineering oversight.

Production

Recurring automotive and hardware programs

Production work at the Shenzhen facility, run under documented quality control with U.S. engineering oversight.

Production & Shipping

Shipping and lead time

Controlled Production. Global Footprint.

World map highlighting Redstone manufacturing regions

Shenzhen, China

Anchor production city. Casting, machining, sheet metal, MIM, and plastic injection in certified facilities. ISO 9001:2015 and IATF 16949.

U.S. program management

DFM review, scheduling, quality documentation, and customs run from the U.S. Account Manager, with one point of contact per program in your business day.

Lead time 4-8 weeks

Shipping and lead time

Ocean freight runs from the Shenzhen port to your U.S. port of entry, then inland to your dock. U.S. customs brokerage and applicable duties are handled end to end by the Redstone logistics team and priced into the quote. What you see at quote is what you pay at delivery.

Questions, answered

Shenzhen production, the details that matter

Is China production still cost-effective with U.S. import duties?

For most volume programs, yes. China remains one of the most cost-effective manufacturing regions even after applicable duties. We assess and quote duties up front at the feasibility review, so the landed cost you compare is the landed cost you pay. The answer depends on the specific program, tariff classification, and volume, and we tell you at the quote stage.

What processes can Redstone run in Shenzhen?

Sand casting, investment casting, die casting in aluminum and zinc, CNC machining, sheet metal fabrication, metal injection molding, and plastic injection molding. Secondary machining and finishing run in-line at the certified facilities.

What quality documentation comes with China shipments?

Every shipment includes a Certificate of Conformance and a dimensional inspection report. First-article inspection is standard on every new part. Third-party inspection at origin runs before every shipment. PPAP packages are available on regulated programs. Statistical process control records and material traceability are maintained for the life of the program.

Can Redstone take over an existing China program that has quality problems?

Yes. Send the existing tool drawings, part history, and current supplier documentation. We assess transfer feasibility, run a parallel quote at our Shenzhen certified facility, and project the landed-cost and lead-time impact before you commit. Existing tooling is often re-usable after assessment. The program stays in China and moves to a certified facility with U.S. oversight.

What are the lead times and how does shipping work?

Standard production lead time is 4 to 8 weeks from approved tooling. Ocean freight from China to a U.S. port of entry adds transit time on top, handled by the Redstone logistics team with customs cleared on arrival. The full timeline including ocean freight is quoted at the feasibility review. Redstone is the importer of record.

Request a quote

Ready to quote a China program?

Send your part files and annual volume. Your U.S. Account Manager reviews every submission for manufacturability and process fit before quoting. Full quote with duties and freight included.

  • ISO 9001 and IATF 16949 certified facility
  • Dedicated U.S. Account Manager, RFQ through delivery
  • U.S. customs and duties handled end to end
  • $50,000 minimum program value, volume programs
Engineers online
Request a quote
Parts
Specs
Contact

PDF, STEP, IGES, DXF, or DWG · up to 10 files, 128 MB total. Optional. You can add files one at a time or several at once.

    Secure 5-Day Response
    Thank you.
    Our engineering team will review your submission within 24 hours. Check your inbox for a confirmation.
    Capability Index

    Explore Redstone capabilities

    Browse Redstone processes, materials, and secondary operations that support production-ready metal parts.

    Show capabilities Hide capabilities
    Secondary Operations
    Related Processes